91抖阴 Review Confirms DEEP Earth Energy Production’s Geothermal Resource Will Support Phase 1 and 2 Developments for 40 Years of Power Generation

已发表: 06/05/2024

GR_Bulletin_hero

Geothermal Rising Bulletin

Volume 50, Issue 3. Winter 2024

 

DEEP Earth Energy Production Corporation (DEEP) is at the forefront of the Canadian energy landscape as it initiates the construction of its first geothermal power facility in 2023. This marks the introduction of conventional geothermal power generation into Canada for the first time. This project will leverage

After more than a decade of

In 2020, DEEP drilled the world’s first horizontal well for geothermal power generation. This design optimizes fluid productivity and reduces parasitic power consumption required for sedimentary power generation. After successfully completing 53 days of production testing at 1,800m3/day, DEEP innovated a well design of alternating horizontal production and injection wells. This horizontal “ribcage” design “cracks the code” for economic fluid production for sedimentary geothermal fields.